1. Hang the safety net from the second floor and set it up every 10 meters (or three floors). The safety net must be intact and reliable.
2. Pulling must be firm. The diameter of the pre-embedded steel mesh wall is not less than 14, and the length of the steel bar is not less than 30d.
3. The elevator shaft protection safety net shall not be dismantled at will. When the elevator is installed with scaffolding, it can be removed every time it reaches the height of the safety net.
4. The scaffolding of the elevator shaft is always erected with steel pipes and fasteners. The vertical and horizontal bars are connected by right angle fasteners, and the fastening torque of the fasteners reaches 4-5kg.m.
5. All the horizontal ends of the scaffolding are tightly supported with the wall surface. The distance between the surrounding horizontal wall and the wall surface is 60cm on the balance weight side and 40 cm on the other three sides. The steel pipe should be added to the wall. The spacing should be no more than 20 cm, and the wall surface of the partition steel bars should be no more than 20 cm.
6, scaffolding column distance is not more than 1.8 meters, the row spacing is 1.8 meters, each row below the floor surface 20 cm plus a row of horizontal rafts, the horizontal spacing is 35cm, full of bamboo rafts, bamboo rafts are always connected with 18# double strands Bundle no less than 4 points and tie the steel pipe firmly.
7. The order of demolition of scaffolding should be carried out from top to bottom. The removed steel pipes and bamboo poles must be properly transported out of the elevator shaft, and littering is prohibited.
8. The facilities in the elevator shaft must be inspected and maintained regularly by scaffolding maintenance personnel to find hidden dangers in time.
9. When installing the safety net and dismantling the facilities in the hoistway, the operator must wear the seat belt, and the hanging point must be safe and reliable.

Metal Pole

Yixing Futao Metal Structural Unit Co. Ltd. is com manded of Jiangsu Futao Group.
It is located in the beach of scenic and rich Taihu Yixing with good transport service.
The company is well equipped with advanced manufacturing facilities.
We own a large-sized numerical control hydraulic pressure folding machine with once folding length 16,000mm and the thickness 2-25mm.
We also equipped with a series of numerical control conveyor systems of flattening, cutting, folding and auto-welding, we could manufacture all kinds of steel poles and steel towers.
Our main products: high & medium mast lighting, road lighting, power poles, sight lamps, courtyard lamps, lawn lamps, traffic signal poles, monitor poles, microwave communication poles, etc. Our manufacturing process has been ISO9001 certified and we were honored with the title of the AAA grade certificate of goodwill"
Presently 95% of our products are far exported to Europe, America, Middle East, and Southeast Asia, and have enjoyed great reputation from our customers,
So we know the demand of different countries and different customers.
We are greatly honored to invite you to visit our factory and cheerfully look forward to cooperating with you.

Metal Pole,Metal Light Pole,Metal Power Pole,Metal Utility Pole

YIXING FUTAO METAL STRUCTURAL UNIT CO.,LTD( YIXING HONGSHENGYUAN ELECTRIC POWER FACILITIES CO.,LTD.) , https://www.chinasteelpole.com

This entry was posted in on