**Lot Number: AJB170005-04SG**
Nanjing Pukou New City Development & Construction Co., Ltd. is the tenderer for the Jiangbei New District Planning Exhibition Hall (New District Civic Center) construction project, which has received approval from the relevant authorities under Approval No.: Ningxin District Guan Jingfa [2017] No. 1. The funding required for this project, consisting of state-owned non-governmental funds amounting to 129,686,800 yuan, has been secured. To ensure a fair and transparent process, the qualification review of bidders will be conducted through an online prequalification system, allowing only qualified applicants to proceed with the bidding.
This project is being managed by the tendering agency, which is entrusted by the tenderer to oversee the entire bidding process. The bidding will take place in an online format, ensuring accessibility and efficiency for all participants.
**Project Overview:**
1. **Bid Name:** General Contracting Project
2. **Location:** Dingshan Street, Pukou District
3. **Project Type:** Large-scale public infrastructure
4. **Construction Content:** Civil construction, mechanical and electrical installation, steel structure and grid structure engineering, fire protection systems
5. **Building Structure:** Steel structure
6. **Duration Requirement:** 600 calendar days
7. **Estimated Contract Value:** 550 million yuan
8. **Scope of Bidding:** Includes civil works, hydropower installation, steel and grid structures, and fire protection engineering
9. **Description of the Project:** This multi-functional city hall integrates urban display, administrative services, civic activities, and supporting facilities. It includes the New District Planning Exhibition Hall, New District Civic Center, Government Affairs Service Halls, warehouses, underground garages, equipment rooms, outdoor plazas, and green spaces. It is a technically complex large public building.
10. **Project Scale:** The site covers approximately 2.0578 hectares, with a total construction area of about 75,256.3 square meters, including 48,546 square meters above ground and 26,710.3 square meters in the basement. The maximum span is 43.8 meters, and the building height reaches 35.82 meters.
**Qualification Requirements for Bidders:**
1. **General Contractor Qualification:** Must hold at least a first-level qualification.
2. **Project Manager Qualification:** Must possess a Grade 1 Registered Construction Engineer certificate.
3. **Joint Bids:** Not allowed.
4. **Yellow Card Units:** Not permitted to participate.
**Prequalification Documents:**
Applicants are required to download the prequalification documents from the Nanjing Public Resource Trading Center website (ggzy.njzwfw.gov.cn/njggzy) between the announcement date and the submission deadline.
**Prequalification Review Method:**
The review follows the guidelines outlined in Su Jianzi (2013) No. 4. Eligible bidders must meet the following criteria:
- Have the ability to independently conclude contracts.
- Not currently suspended or disqualified due to legal issues.
- No history of bid rigging, major quality or safety violations.
- Meet the required qualifications for both the company and the project manager.
- If applying as a consortium, a joint bidding agreement must be submitted.
- Possess a valid safety production license.
- The project leader must not be under construction or have completed a project within the last six months unless specific conditions are met.
**Optional Qualification Conditions:**
- The bidder must have undertaken similar or larger-scale projects, specifically public buildings with a construction area of 45,000 square meters or more since November 1, 2012.
**Selection of Bidders:**
A limited number system will be used, selecting up to nine prequalified bidders based on their scores. All materials must be uploaded to the “e Road Sunshine†credit platform before submitting the prequalification application.
**Bid Evaluation Method:**
A comprehensive assessment method is used, including:
- A detailed construction organization design review.
- Benchmark price calculation using either Method 1 or Method 2, depending on the number of bids.
- Scoring of deviations from the benchmark price.
- Credit score based on the Nanjing Municipal Construction and Construction Committee’s rating.
**Additional Requirements:**
- All bidder names must match the business license, qualification certificate, and safety license.
- Proof of old-age insurance for the project leader for the past six months is required.
- The project leader must be available for verification during the prequalification period.
- Deadline for submitting prequalification documents is December 25, 2017, at 09:30 Beijing Time.
- The prequalification review will take place at Room 1247, Nanjing Public Resource Exchange Center.
**Scoring System:**
- Financial status (20 points)
- Similar project performance (40 points)
- Certifications (10 points)
- Engineering awards (20 points)
- Project leader response (10 points)
**Final Notes:**
All submitted documents must be accurate and complete. Any falsified information may result in disqualification. The announcement period runs from 09:33 on December 13, 2017, to 09:33 on December 20, 2017.
We have got 220kV Transmission Line Substation Structure Quality Certificate from Power Industry Steel Tower Qualified Inspection & Test Center from 2001 year. Our products are made from quality sheet through bending, forming, automatic welding and hot galvanization. We can reach one-run machining length of 14m and can bend sheet of thickness up to 45mm. We adopt advanced welding procedures, automatically weld main joints and reach rank-II welding quality.
Substation Structure, Substation Steel Structure, Steel Tubular Substation Structures, Steel Structure For Substation
JIANGSU XINJINLEI STEEL INDUSTRY CO.,LTD , https://www.steel-pole.com